RT-S52SV Rigging Tower

The third version of the rigging tower is the RT-S52SV.
This medium to heavy-duty version comes in three different types.

This RT-S52SV rigging tower is the ideal solution for medium- to large-scale events or concerts where flexibility counts. The system can easily be converted from one type to another by simply adjusting the length of the mast. Based on the S52SV truss, with a stabilising system of H30D truss and a self-weight of 463-520 kg this rigging tower is a flexible and cost efficient solution. The sturdy construction and the fact that the system can be easily changed from one type to another makes it suitable for all sorts of surroundings and applications, like outdoor events, public manifestations and concert areas.

After the V-shaped base is assembled the legs can be levelled by means of screw jacks that attach to the side of the legs.
Then the erection system for the mast must be build; this will later act as the stabilising system. After this the mast can be assembled and erected by means of the erection system that works with the aid of an electrical hoist.
The mast should be stabilised by means of the braces, which fix to the hinges on the legs. After the system is build, levelled and ballast is applied, the load can be hoisted in position.

  

Recommend this article...